To have a possibility to change the timing of an information set for the expectation variables with geometric discounting. At this stage it is hard coded at time t.
Designs
Child items ...
Show closed items
Linked items 0
Link issues together to show that they're related.
Learn more.
Done for VAR based expectations in fe63082c, I suppose we should do the same for PAC expectations... Note however that the default periods for VAR expectations (t) and PAC expectations (t-1) are not the same.
@stepan-a, I am not sure that's the right place, but I have a feeling my problem is connected to this issue. When running pac estimation with new Dynare version (4.8 July) I obtain strange results. I checked "test" and actually if you run dynare\tests\pac\var-6\example1.mod in 4.7 and 4.8, you'll see that parameters of pac_expectation variable are diferent depending on a version.
In 4.7 I obtain: