Document of fix behavior of det_cond_forecast

From https://forum.dynare.org/t/error-messages-when-building-the-forecast/22873/4. I think there is either a bug or the manual is wrong. det_cond_forecast seems to always expect three input arguments, i.e. the initial forecast date is mandatory. IN_AUX.csv UForecast.mod

Moreover, the second argument is supposed to indicate the past values of the endogenous variables. But using UForecast_3_arguments.mod I get the error message

the dseries smoothed finish at time 2023Q2 before the last period of forecast 2024Q3

which does not make sense if only past values are needed.

Assignee Loading
Time tracking Loading